Hacker Newsnew | past | comments | ask | show | jobs | submitlogin

If I were mayor, I would require new construction to have 1kw of grid intertied solar per unit.


A 1kW system is horribly inefficient. That's 4 modules, which even in series is not going to get you to grid voltage so you will have to use costly microinverters. Plus you have all the fixed costs of installation, inspection, switchgear, etc. that has to be amortized over a tiny amount of power. Silly. For most circumstances, 4-5kW is going to be the minimum economical installation. There are many people who know how to evaluate a particular site and customer needs to figure out what is and is not economical and how to accomplish that. The mayor, and you, probably are not among them.

This is why politicians need to stay away and let the market do its job. It's too easy to let ignorance or some temporary set of circumstances lead you to impose costly and harmful regulations with far-reaching effects.


> horribly inefficient

No. And I wasn't making a spec. I'd be optimizing for something else, installed base, know how and a population of contractors kickstarted into action. This was a minimum, not forcing people to ONLY install 1kw.

http://www.wholesalesolar.com/1977311/astronergy/solar-panel...

If we are arguing over buck or boost when it comes to solar penetration we arguing at the wrong abstraction level.


and then most city will burn down because once a unit is on fire, there is no reliable way (yet!) to have firefighter safely turn panels down to avoid electrocution. especially damaged solar cells that can produce energy while being shorted as contacts melt

distributed solar is nice and dandy but it does have some share of problems to solve before becoming viable.

a solar concentrator in the desert, on the other hand...




Guidelines | FAQ | Lists | API | Security | Legal | Apply to YC | Contact

Search: